§ 98-40. Flow equalization.  


Latest version.
  • If there are unusual volumes of industrial waste or the character of the industrial waste exceeds that of normal waste at certain times within a 24-hour period, a flow-equalizing tank may be required so that the discharge over a 24-hour period complies with the normal waste quality and flow requirement.

(Ord. No. O-15-11, § I, 4-11-2011)